199 views
in General by (115k points)
closed by

A manufacturing shop processes sheet metal jobs, wherein each job must pass through two machines (M1 and M2, in that order). The processing time (in hours) for these jobs is:

Machine

Jobs

P

Q

R

S

T

U

M1

15

32

8

27

11

16

M2

6

19

13

20

14

7


The optimal make-span (in hours) of the shop is:


1. 120
2. 115
3. 109
4. 79

1 Answer

0 votes
by (152k points)
selected by
 
Best answer
Correct Answer - Option 2 : 115

According to Johnson’s algorithm sequencing of jobs is

R

T

S

Q

U

P


Now,

Job

M1

M2

In

Out

In

Out

R

0

8

8

21

T

8

19

21

35

S

19

46

46

66

Q

46

78

78

97

U

78

94

97

104

P

94

109

109

115


From this the optimal make span of the shop is 115.

Welcome to Sarthaks eConnect: A unique platform where students can interact with teachers/experts/students to get solutions to their queries. Students (upto class 10+2) preparing for All Government Exams, CBSE Board Exam, ICSE Board Exam, State Board Exam, JEE (Mains+Advance) and NEET can ask questions from any subject and get quick answers by subject teachers/ experts/mentors/students.