What percentage of cost is added at the time of rate analysis for masonry work
1. 15%
2. 2%
3. 5%
4. 3%

1 Answer

0 votes
by (54.3k points)
selected by
 
Best answer
Correct Answer - Option 1 : 15%

Concept:

Rate analysis

  • It is the determination of the cost of each construction work per unit quantity.
  • This cost includes the cost of materials, labor, machinery, contractor's profit, etc.

Following Rate analysis is mainly done in civil engineering:

  1. Rate Analysis of Earthwork
  2. Rate Analysis of Brick
  3. Rate Analysis of Concrete
  4. Rate Analysis of Plaster

Note:

During rate analysis of brickwork or masonry work, 15 % on items marked is added for contractor's profit.

Welcome to Sarthaks eConnect: A unique platform where students can interact with teachers/experts/students to get solutions to their queries. Students (upto class 10+2) preparing for All Government Exams, CBSE Board Exam, ICSE Board Exam, State Board Exam, JEE (Mains+Advance) and NEET can ask questions from any subject and get quick answers by subject teachers/ experts/mentors/students.