Correct Answer - Option 2 : 6 days
Given
Ramesh can do 2/5th work = 12 days
Mahesh can do \(66\frac 2 3\)% = 16 days
Formula
Work = Time × Efficiency
Calculation
⇒ \(66\frac 2 3\)% = 2/3
⇒ Ramesh can do 1 work = 12 × (5/2) = 30 days
⇒ Mahesh can do 1 work = 16 × (3/2) = 24 days
⇒ Let total work be 120 (LCM of 24, 30)
⇒ Using efficiencies of both or one day work
⇒ (1/R) + (1/M) = (1/30) + (1/24)
⇒ (R + M) efficiency = 4 + 5 = 9
⇒ (R + M), 10 days work = 10 × 9 = 90
⇒ Remaining work = 30
⇒ Mahesh required days = 30/5 = 6 days
∴ Mahesh required 6 days to complete the remaining work