Correct Answer - Option 1 : 25 days
Given:
A and B together takes = 10 days
C alone takes = 50 days
B and C together takes = Time take by A alone
Calculation:
(A + B)’s 1 day’s work = 1/10
C’s 1 day’s work = 1/50
∴ (A + B + C)’s 1 day’s work = 1/10 + 1/50
⇒ 6/50
⇒ 3/25 ----(i)
A’s 1 day’s work = (B + C)’s 1 day’s work ----(ii)
From (i) and (ii), we get: 2 × (A’s 1 day’s work) = 3/25
∴ A’s 1 day’s work = 3/50
∴ B’s 1 day’s work = (1/10 – 3/50)
⇒ 2/50
⇒ 1/25
∴ B alone will take 25 days to do the work.