Use app×
Join Bloom Tuition
One on One Online Tuition
JEE MAIN 2025 Foundation Course
NEET 2025 Foundation Course
CLASS 12 FOUNDATION COURSE
CLASS 10 FOUNDATION COURSE
CLASS 9 FOUNDATION COURSE
CLASS 8 FOUNDATION COURSE
0 votes
1.8k views
in General by (115k points)
The distribution mains are designed for
1. Maximum daily demand
2. Maximum hourly demand
3. Average daily demand
4. Maximum hourly demand on maximum day

1 Answer

0 votes
by (114k points)
selected by
 
Best answer
Correct Answer - Option 4 : Maximum hourly demand on maximum day

Explanation:

(i) The sources of supply (such as wells) may be designed for maximum daily consumption or some times for average daily consumption.

(ii) The pipe mains (to take water from source to service reservoir) and filter and other treatment units are designed for the maximum daily draft.

(iii) Pumps may be designed for maximum daily draft plus some additional reserve for break down and repair.

(iv) The distribution system (to carry water from service reservoir to water taps) should be designed for the maximum hourly draft of maximum day or coincident draft with fire, whichever is more.

(v) The service reservoir is designed to take care of hourly fluctuations, fire demands and emergency reserves.

Welcome to Sarthaks eConnect: A unique platform where students can interact with teachers/experts/students to get solutions to their queries. Students (upto class 10+2) preparing for All Government Exams, CBSE Board Exam, ICSE Board Exam, State Board Exam, JEE (Mains+Advance) and NEET can ask questions from any subject and get quick answers by subject teachers/ experts/mentors/students.

Categories

...