Which of the following generating power stations requires lot of time for starting?
1. Steam power station
2. Diesel power plant
3. Hydro-electric power plant
4. Nuclear power plant

1 Answer

0 votes
by (238k points)
selected by
 
Best answer
Correct Answer - Option 1 : Steam power station

Steam power station:

A generating station which converts heat energy of coal combustion into electrical energy is known

as a steam power station.

A steam power station basically works on the Rankine cycle. Steam is produced in the boiler by utilising the heat of coal combustion.

Advantages:

  • The fuel (i.e., coal) used is quite cheap.
  • Less initial cost as compared to other generating stations.
  • It can be installed at any place irrespective of the existence of coal. The coal can be transported to the site of the plant by rail or road.
  • It requires less space as compared to the hydroelectric power station.
  • The cost of generation is lesser than that of the diesel power station.

 

Disadvantages:

  • It pollutes the atmosphere due to the production of large amount of smoke and fumes.
  • It is costlier in running cost as compared to hydroelectric plant.
  • It requires lot of time for starting.

Welcome to Sarthaks eConnect: A unique platform where students can interact with teachers/experts/students to get solutions to their queries. Students (upto class 10+2) preparing for All Government Exams, CBSE Board Exam, ICSE Board Exam, State Board Exam, JEE (Mains+Advance) and NEET can ask questions from any subject and get quick answers by subject teachers/ experts/mentors/students.