Correct Answer - Option 1 : 9/2 hours
GIVEN:
A pump can fill a tank with water in 2 hours. Because of a leak, it took 18/5 hours to fill the tank.
CALCULATION:
Suppose leak can drain all the water of the tank in ‘T’ hours.
So,
1/2 - 1/T = 5/18
⇒ 1/T = 1/2 - 5/18
⇒ 1/T = 4/18 = 2/9
Hence, leak can drain all the water of the tank in 9/2 hours.