Correct option is (B) 15,180
Let ‘W’ be the labour wages, and ‘T’ be the working hours.
Now, total cost is a function of W x T
Increase in wages = 20%
∴ Revised wages = 1.2 W
Decrease in labour time = (100/24)%
∴ Revised time = (1 - 1/24)T = 23/24 T
∴ Revised Total cost = 1.2 x 23/24 WT = 1.15 WT
= 1.15 x 13200 = 15180