Given: R = 15/week ; and
R = 15 × 52 per year.
C1 = Rs. 100 per unit/year.
C3 = Rs. 350 per order.
Q° = 73.89 units
Re-scheduling time t° = \(\frac{Q°}{R}\)
=\(\frac{73.89}{15\times52}\) = 0.0947 years.
i.e., 66 units should be ordered approximately every 1 month.
The optimum average cost/minimum average cost :
= Rs. 7389.18 per year.