Correct Answer - `0.9286`
`P = 179 X_(B) +92`
`P_(B)^(@) = 271, P_(T)^(@) = 92`
`n_(B) = (936)/(78) = 12, n_(T) = (736)/(92) = 8`
`X_(B) = (12)/(20) = 0.6 X_(T) = 0.4`
`P_(T) = 271 xx 0.6 +92 xx 0.4 = 199.4`
`Y_(B) = (271 xx 0.6)/(199.4) = 0.815`
`Y_(T) = 0.185`
On further condensation
`X_(B) = 0.815, X_(T) = 0.185`
`P_(T) = 271 xx 0.815 +92 xx 0.185 = 237.844`
`Y_(B) = (271 xx 0.815)/(237.844) = 0.9286`