 In building work, the cost for internal electrification, sanitary and water supply works is around.
1. 10% of estimated cost of building
2. 15% of estimated cost of building.
3. 20% of estimated cost of building.
4. 25% of estimated cost of building.

1 Answer

0 votes
by (103k points)
selected by
 
Best answer
Correct Answer - Option 3 : 20% of estimated cost of building.

Explanation:

  • While preparing an estimate, it is not possible to work out in detail in case of petty items. Items are other than civil engineering items are called lumpsum items.
  • The following are some of the lumpsum items in the estimate.
Work Percentage of estimate
Water supply and sanitary arrangements 8
Electrical installation 8
Contingencies and unforeseen items 3 - 5
Work charge establishments 1.5 - 2

 

So, the Total percent estimate of internal electrification, sanitary, and water supply works is 8 + 8 = 16 % 

Including Continegencies and unforssen items it would be 16 + 4 = 20 %

  • Even if sub estimates prepared or at the end of execution of work, the actual cost should not exceed the lump sum amount provided in the main estimate.

Welcome to Sarthaks eConnect: A unique platform where students can interact with teachers/experts/students to get solutions to their queries. Students (upto class 10+2) preparing for All Government Exams, CBSE Board Exam, ICSE Board Exam, State Board Exam, JEE (Mains+Advance) and NEET can ask questions from any subject and get quick answers by subject teachers/ experts/mentors/students.