+1 vote
2.0k views
in Mathematics by (130k points)

A manufacturer produces nuts ad bolts. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit, of Rs 17.50 per package on nuts and Rs. 7.00 per package on bolts. How many packages of each should be produced each day so as to maximize his profit, if he operates his machines for at the most 12 hours a day?

1 Answer

+1 vote
by (93.9k points)
edited by
 
Best answer

Let the manufacturer produce x packages of nuts and y packages of bolts. Therefore, x ≥ 0 and y ≥ 0
The given information can be compiled in a table as follows.

The profit on a package of nuts is Rs 17.50 and on a package of bolts is Rs 7. Therefore, the constraints are

x+3y≤12

3x+y≤12

Total profit, Z = 17.5x + 7y
The mathematical formulation of the given problem is Maximise Z = 17.5x + 7y … (1) subject to the constraints, x + 3y ≤ 12 … (2) 3x + y ≤ 12 … (3) x, y ≥ 0 … (4)

The feasible region determined by the system of constraints is as follows.

The corner points are A (4, 0), B (3, 3), and C (0, 4).
The values of Z at these corner points are as follows.

The maximum value of Z is Rs 73.50 at (3, 3). Thus, 3 packages of nuts and 3 packages of bolts should be produced each day to get the maximum profit of Rs 73.50.

Welcome to Sarthaks eConnect: A unique platform where students can interact with teachers/experts/students to get solutions to their queries. Students (upto class 10+2) preparing for All Government Exams, CBSE Board Exam, ICSE Board Exam, State Board Exam, JEE (Mains+Advance) and NEET can ask questions from any subject and get quick answers by subject teachers/ experts/mentors/students.