Correct Answer - Option 5 : 0.70
Concept:
According to Lacey’s, the design formulas to build canal is as follows:
1) Silt factor ⇒ \(\rm{f = 1.76√ {{d_{mm}}}}\)
2) Velocity of flow ⇒ \(\rm{V = {\left[ {\frac{{Q{f^2}}}{{140}}} \right]^{\frac{1}{6}}}}\)
3) Hydraulic mean depth ⇒ \(\rm{R = \frac{{5{V^2}}}{{2f}}}\)
4) Wetted perimeter ⇒ \(\rm{P = 4.75√ Q}\)
5) Bed slope ⇒ \(\rm{S = \frac{{{f^{\frac{5}{3}}}}}{{3340 \times {Q^{\frac{1}{6}}}}}}\)
Calculation:
Lacey’s silt factor:
f \(= 1.76\sqrt {{d_m}}\)
\(= 1.76\sqrt {0.16} = 0.70\)