Correct Answer - Option 2 :
35.3 days
Calculation:
Let total work be 150 units.
Since Kishan does 70% of the work (i.e. 105 units) in 15 days,
Kishan = 105/15
⇒ 7 units per day
Work left = 150 – 105
⇒ 45 units
Let Mahesh do x units of work per day. Mahesh and Kishan finish the pending work in 4 days.
∴ 4(x + 7) = 45
⇒ 4x + 28 = 45
⇒ 4x = 17
⇒ x = 4.25 units
∴ Time taken by Mahesh to complete the work = 150/4.25
⇒ 35.29 ≈ 35.3 days